UFC 3-270-06 Paver Asphalt Surfaced Airfields Pavement Condition Index (PCI) Replaced by UFC 3-260-16 O&M Manual: Standard Practice for Airfield Pavement Condition Surveys |
|
PDF |
|
UFC 3-270-07 O&M: Airfield Damage Repair, Superseded by TSPWG M 3-270-01.3-270-07 |
|
PDF |
|
UFC 3-270-08 Pavement Management |
|
PDF |
CCR |
UFC 3-280-01A Guidance for Ground Water/Fuel Extraction and Ground Water Injection Systems |
|
PDF |
|
UFC 3-280-02A Hazardous Waste Land Disposal/Land Treatment Facilities, Cancelled without Replacement |
|
PDF |
|
UFC 3-280-03 Army Plate and Frame Filter Press |
|
PDF |
|
UFC 3-280-04 Army Filtration of Liquids |
|
PDF |
CCR |
UFC 3-300-10N Structural Engineering, with Changes 1-2, Replaced by UFC 3-301-01 |
|
PDF |
|
UFC 3-301-01 Structural Engineering, with Change 3 |
|
PDF |
CCR |
UFC 3-301-02 Design of Risk Category V Structures, National Strategic Military Assets, with Change 1 |
|
PDF |
CCR |
UFC 3-301-05A Seismic Evaluation and Rehabilitation for Buildings, Replaced by UFC 3-310-04 |
|
PDF |
|
UFC 3-310-01 Structural Load Data, with Change 2, Replaced by UFC 3-301-01 |
|
PDF |
|
UFC 3-310-02A Structural Design Criteria for Buildings, Replaced by UFC 3-301-01 |
|
PDF |
|
UFC 3-310-03A Seismic Design for Buildings, Replaced by UFC 3-310-04 |
|
PDF |
|
UFC 3-310-04 Seismic Design of Buildings, with Change 1 |
|
PDF |
|
UFC 3-310-05A Masonry Structural Design for Buildings, Replaced by UFC 3-301-01 |
|
PDF |
|
UFC 3-310-07A Cold-Formed Load Bearing Steel Systems and Masonry Veneer/Steel Stud Walls, Replaced by UFC 3-301-01 |
|
PDF |
|
UFC 3-310-08 Non-Expeditionary Bridge Inspection, Maintenance and Repair |
|
PDF |
CCR |
UFC 3-320-01A Welding -- Design Procedures and Inspections, Replaced by UFC 3-301-01 |
|
PDF |
|
UFC 3-320-02A Design and Construction of Conventionally Reinforced Ribbed Mat Slabs (RRMS), Replaced by UFC 3-301-01 |
|
PDF |
|
UFC 3-320-03A Structural Considerations for Metal Roofing, with Change 2, Replaced by UFC 3-110-03 |
|
PDF |
|
UFC 3-320-04A Metal Building Systems, with Change 2, Replaced by UFC 3-301-01 |
|
PDF |
|
UFC 3-320-05A Structural Design Criteria for Structures Other Than Buildings, Replaced by UFC 3-301-01 |
|
PDF |
|
UFC 3-320-06A Concrete Floor Slabs on Grade Subjected to Heavy Loads |
|
PDF |
CCR |
UFC 3-330-01A Commentary on Snow Loads, Replaced by UFC 3-301-01 |
|
PDF |
|
UFC 3-330-02A Commentary On Roofing Systems, Replaced by UFC 3-110-03 |
|
PDF |
|
UFC 3-330-03A Seismic Review Procedures for Existing Military Buildings, Replaced by UFC 3-310-04 |
|
PDF |
|
UFC 3-340-01 Design and Analysis of Hardened Structures to Conventional Weapons Effects (FOUO) |
|
PDF |
CCR |
UFC 3-340-02 Structures to Resist the Effects of Accidental Explosions, with Change 2 |
|
PDF |
CCR |
UFC 3-340-02AN Facilities System Engineering: Designing Facilities to Resist Nuclear Weapon Effects, Replaced by UFC 3-340-10AN |
|
PDF |
|
UFC 3-340-03AN Weapons Effects: Designing Facilities to Resist Nuclear Weapon Effects, Replaced by UFC 3-350-03AN |
|
PDF |
|
UFC 3-340-04AN Structures: Designing Facilities to Resist Nuclear Weapon Effects, Replaced by UFC 3-350-04AN |
|
PDF |
|
UFC 3-340-05AN Shock Isolation Systems: Designing Facilities to Resist Nuclear Weapon Effects, Replaced by UFC 3-350-05AN |
|
PDF |
|
UFC 3-340-06AN Air Entrapment, Fasteners, Penetration Protection, Hydraulic-Surge Protection Devices and EMP Protective Devices: Designing Facilities to Resist Nuclear Weapon Effects, Replaced by UFC 3-350-06AN |
|
PDF |
|
UFC 3-340-07AN Hardness Verification: Designing Facilities to Resist Nuclear Weapon Effects, Replaced by UFC 3-350-07AN |
|
PDF |
|
UFC 3-340-09AN Illustrative Examples: Designing Facilities to Resist Nuclear Weapon Effects, Replaced by UFC 3-350-09AN |
|
PDF |
|
UFC 3-340-10AN Facilities System Engineering: Designing Facilities to Resist Nuclear Weapon Effects, Replaced by UFC 3-350-10AN |
|
PDF |
|
UFC 3-340-13 Basic Guidelines for Chemical Warfare Hardening of Facilities, Replaced by UFC 4-024-01 |
|
PDF |
|
UFC 3-350-03AN Weapons Effects: Designing Facilities to Resist Nuclear Weapon Effects, with Change 2, INACTIVE with No Replacement |
|
PDF |
|
UFC 3-350-04AN Structures: Designing Facilities to Resist Nuclear Weapon Effects, with Change 2 |
|
PDF |
|
UFC 3-350-05AN Shock Isolation Systems: Designing Facilities to Resist Nuclear Weapon Effects, INACTIVE with No Replacement |
|
PDF |
|
UFC 3-350-05AN Shock Isolation Systems: Designing Facilities to Resist Nuclear Weapon Effects, with Change 2 |
|
PDF |
|
UFC 3-350-06AN Air Entrapment, Fasteners, Penetration Protection, Hydraulic-Surge Protection Devices and EMP Protective Devices: Designing Facilities to Resist Nuclear Weapon Effects, with Change 2 |
|
PDF |
|
UFC 3-350-07AN Hardness Verification: Designing Facilities to Resist Nuclear Weapon Effects, with Change 2 |
|
PDF |
|
UFC 3-350-08AN Facilities Support Systems: Designing Facilities to Resist Nuclear Weapon Effects, with Change 2 |
|
PDF |
|
UFC 3-350-09AN Illustrative Examples: Designing Facilities to Resist Nuclear Weapon Effects, with Change 2 |
|
PDF |
|
UFC 3-350-10AN Facilities System Engineering: Designing Facilities to Resist Nuclear Weapon Effects, with Change 1 |
|
PDF |
|
UFC 3-400-01 Energy Conservation, with Change 4, Replaced by UFC 1-200-02 |
|
PDF |
|
UFC 3-400-02 Design: Engineering Weather Data, with Change 2 |
|
PDF |
CCR |
UFC 3-400-10N Mechanical Engineering, with Change 1, Replaced by UFC 3-410-01 |
|
PDF |
|
UFC 3-401-01 Mechanical Engineering, with Change 1 |
|
PDF |
CCR |
UFC 3-401-01FA Utility Monitoring and Control Systems, Replaced by UFC 3-470-01 |
|
PDF |
|
UFC 3-401-05N Estimating Energy and Water Consumption for Shore Facilities and Cold Iron Support for Ships, Cancelled without Replacement |
|
PDF |
|
UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems, with Change 9 |
|
PDF |
CCR |
UFC 3-410-01FA Heating, Ventilating, and Air Conditioning, with Change 4, Replaced by UFC 3-410-01 |
|
PDF |
|
UFC 3-410-02 Direct Digital Control for HVAC and Other Building Control Systems, with Change 2 |
|
PDF |
CCR |
UFC 3-410-02A Heating, Ventilating, and Air Conditioning (HVAC) Control Systems, with Change 1, Replaced by UFC 3-410-02 |
|
PDF |
|
UFC 3-410-02N Heating, Ventilating, Air Conditioning and Dehumidifying Systems, Replaced by UFC 3-400-10N |
|
PDF |
|
UFC 3-410-03FA Heating, Ventilating, and Air Conditioning of Hardened Installations, with Change 1, Replaced by UFC 4-024-01 |
|
PDF |
|
UFC 3-410-04 Industrial Ventilation |
|
PDF |
CCR |
UFC 3-410-04N Design: Industrial Ventilation Systems, Replaced by UFC 3-410-04 |
|
PDF |
|
UFC 3-410-05N Heating Systems Operation and Maintenance |
|
PDF |
|
UFC 3-410-06N Central Heating Plants Operation and Maintenance |
|
PDF |
|
UFC 3-420-01 Plumbing Systems |
|
PDF |
CCR |
UFC 3-420-02 Compressed Air |
|
PDF |
CCR |
UFC 3-430-01FA Heating and Cooling Distribution Systems |
|
PDF |
CCR |
UFC 3-430-02FA Central Steam Boiler Plants, with Change 1 |
|
PDF |
|
UFC 3-430-03 Air Pollution Control Systems for Boiler and Incinerators |
|
PDF |
|
UFC 3-430-04FA High Temperature Water Heating Systems |
|
PDF |
|
UFC 3-430-05 Natural Gas and Liquefied Petroleum Gas (LPG) Distribution Pipelines |
|
PDF |
CCR |
UFC 3-430-05FA Gas Distribution, Replaced by UFC 3-430-09 |
|
PDF |
|
UFC 3-430-07 Operations and Maintenance: Inspection and Certification of Boilers and Unfired Pressure Vessels, with Change 5 |
|
PDF |
CCR |
UFC 3-430-08N Central Heating Plants |
|
PDF |
|
UFC 3-430-09 Exterior Mechanical Utility Distribution, with Change 1 |
|
PDF |
CCR |
UFC 3-430-09N Exterior Mechanical Utility Distribution, Replaced by UFC 3-430-09 |
|
PDF |
|
UFC 3-430-11 Boiler Plant Instrumentation and Control Systems |
|
PDF |
CCR |
UFC 3-440-01 Facility-Scale Renewable Energy Systems |
|
PDF |
CCR |
UFC 3-440-02N Water Conservation Operation and Maintenance |
|
PDF |
|
UFC 3-440-03N Passive Solar Buildings |
|
PDF |
|
UFC 3-440-04N Solar Heating of Buildings and Domestic Hot Water, Replaced by UFC 3-440-01 |
|
PDF |
|
UFC 3-440-05N Tropical Engineering, with Changes 1-2 |
|
PDF |
|
UFC 3-440-06N Cooling Buildings by Natural Ventilation |
|
PDF |
|
UFC 3-450-01 Noise and Vibration Control |
|
PDF |
CCR |
UFC 3-450-02 Power Plant Acoustics |
|
PDF |
|
UFC 3-460-01 Design: Petroleum Fuel Facilities, with Change 3 |
|
PDF |
CCR |
UFC 3-460-03 Petroleum Fuel Systems Maintenance, with Change 2 |
|
PDF |
CCR |
UFC 3-470-01 Utility Monitoring and Control System (UMCS) Front End and Integration |
|
PDF |
CCR |
UFC 3-490-03FA High-Pressure Gas and Cryogenic Systems |
|
PDF |
|
UFC 3-490-04A Indoor Radon Prevention and Mitigation |
|
PDF |
|
UFC 3-490-06 Elevators, with Change 1 |
|
PDF |
CCR |
UFC 3-501-01 Electrical Engineering |
|
PDF |
CCR |
UFC 3-501-03N Design: Electrical Engineering Preliminary Design Considerations, Replaced by UFC 3-501-01 and UFC 3-550-01 |
|
PDF |
|
UFC 3-510-01 Foreign Voltages and Frequencies Guide, with Change 2 |
|
PDF |
CCR |
UFC 3-520-01 Interior Electrical Systems |
|
PDF |
CCR |
UFC 3-520-02 Facility Energy System Resilience and Reliability, with Change 1 |
|
PDF |
CCR |
UFC 3-520-05 Stationary and Mission Batteries, with Change 2 |
|
PDF |
CCR |
UFC 3-530-01 Interior and Exterior Lighting Systems, with Change 1 |
|
PDF |
CCR |
UFC 3-535-01 Visual Air Navigation Facilities, with Change 4 |
|
PDF |
CCR |
UFC 3-535-02 Design Drawings for Visual Air Navigation Facilities |
|
PDF |
CCR |
UFC 3-540-01 Engine-Driven Generator Systems for Prime and Standby Power Applications, with Change 3 |
|
PDF |
CCR |
UFC 3-540-02N Steam Power Plants |
|
PDF |
|
UFC 3-540-04N Design: Diesel Electric Generating Plants, Replaced by UFC 3-540-01 |
|
PDF |
|
UFC 3-540-07 Operation and Maintenance (O&M): Generators, with Change 1 |
|
PDF |
CCR |
UFC 3-540-08 Utility-Scale Renewable Energy Systems |
|
PDF |
CCR |
UFC 3-550-01 Exterior Electrical Power Distribution, with Change 3 |
|
PDF |
CCR |
UFC 3-550-03FA Design: Electric Power Supply and Distribution, Replaced bY UFC 3-550-01 |
|
PDF |
|
UFC 3-550-03N Design: Power Distribution Systems, Replaced by UFC 3-550-01 |
|
PDF |
|
UFC 3-550-04 Resilient Installation Microgrid Design |
|
PDF |
CCR |
UFC 3-550-07 Operation and Maintenance (O&M): Exterior Power Distribution Systems |
|
PDF |
CCR |
UFC 3-555-01 Aircraft Point-of-Use Power Systems |
|
PDF |
CCR |
UFC 3-555-01N 400 Hertz Medium Voltage Conversion/Distribution and Low Voltage Utilization Systems |
|
PDF |
|
UFC 3-560-01 Operation and Maintenance: Electrical Safety, with Change 3 |
|
PDF |
CCR |
UFC 3-560-10N O&M: Safety of Electrical Transmission and Distribution Systems, Replaced by 3-560-01 |
|
PDF |
|
UFC 3-570-01 Cathodic Protection, with Change 1 |
|
PDF |
CCR |
UFC 3-570-02A Cathodic Protection, Replaced by UFC 3-570-01 |
|
PDF |
|
UFC 3-570-02N Electrical Engineering Cathodic Protection, Replaced by UFC 3-570-01 |
|
PDF |
|
UFC 3-570-06 Operation and Maintenance: Cathodic Protection Systems |
|
PDF |
CCR |
UFC 3-575-01 Lightning and Static Electricity Protection Systems, with Change 1 |
|
PDF |
CCR |
UFC 3-580-01 Information and Communications Technology Infrastructure Planning and Design |
|
PDF |
CCR |
UFC 3-580-10 Navy And Marine Corps Intranet (NMCI) Standard Construction Practices, Replaced by UFC 3-580-01 |
|
PDF |
|
UFC 3-600-01 Fire Protection Engineering for Facilities, with Change 6 |
|
PDF |
CCR |
UFC 3-601-02 Fire Protection Systems Inspection, Testing, and Maintenance, with Change 1 |
|
PDF |
CCR |
UFC 3-700-01A Design: Programming Cost Estimates for MILCON, Replaced by UFC 3-730-01 |
|
PDF |
|
UFC 3-700-02A Construction Cost Estimates, Replaced by UFC 3-740-05 |
|
PDF |
|
UFC 3-701-01 DoD Facilities Pricing Guide, with Change 6 |
|
PDF |
CCR |
UFC 3-710-01A Code 3 Design with Parametric Estimating, Cancelled without Replacement |
|
PDF |
|
UFC 3-730-01 Programming Cost Estimates for Military Construction |
|
PDF |
CCR |
UFC 3-740-05 Construction Cost Estimating |
|
PDF |
CCR |
UFC 3-810-01N Navy and Marine Corps Environmental Engineering for Facility Construction, with Change 3 |
|
PDF |
CCR |
UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings, with Change 3 |
|
PDF |
CCR |
UFC 4-010-02 DoD Minimum Antiterrorism Standoff Distances for Buildings (FOUO) Replaced by UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings |
|
PDF |
|
UFC 4-010-03 Security Engineering: Physical Security Measures for High-Risk Personnel |
|
PDF |
CCR |
UFC 4-010-05 SCIF/SAPF Planning, Design, and Construction |
|
PDF |
CCR |
UFC 4-010-06 Cybersecurity of Facility-Related Control Systems (FRCS) |
|
PDF |
CCR |
UFC 4-020-01 DoD Security Engineering Facilities Planning Manual |
|
PDF |
CCR |
UFC 4-020-02FA Security Engineering: Concept Design (FOUO) |
|
PDF |
CCR |
UFC 4-020-03FA Security Engineering: Final Design (FOUO) |
|
PDF |
CCR |
UFC 4-020-04FA Security Engineering: Electronic Security Systems, Replaced by UFC 4-021-02 |
|
PDF |
|
UFC 4-021-01 Design and O&M: Mass Notification Systems, with Change 1 |
|
PDF |
CCR |
UFC 4-021-02 Electronic Security Systems, with Change 1 |
|
PDF |
CCR |
UFC 4-022-01 Security Engineering: Entry Control Facilities / Access Control Points |
|
PDF |
CCR |
UFC 4-022-02 Selection and Application of Vehicle Barriers, with Change 1 |
|
PDF |
CCR |
UFC 4-022-03 Security Fences and Gates |
|
PDF |
CCR |
UFC 4-023-03 Design of Buildings to Resist Progressive Collapse, with Change 4 |
|
PDF |
CCR |
UFC 4-023-07 Design to Resist Direct Fire Weapons Effects, with Change 1 |
|
PDF |
CCR |
UFC 4-023-10 Safe Havens |
|
PDF |
CCR |
UFC 4-024-01 Security Engineering: Procedures for Designing Airborne Chemical, Biological, and Radiological Protection for Buildings |
|
PDF |
CCR |
UFC 4-025-01 Security Engineering: Waterfront Security |
|
PDF |
CCR |
UFC 4-026-01 Design to Resist Forced Entry |
|
PDF |
CCR |
UFC 4-027-01 Design of Deployed Operational Bases to Mitigate Terrorist Attacks (CUI) |
|
PDF |
|