P-604 Electrical - Safe Acts For Employees (E-SAFE) |
|
PDF |
|
PACAF - Andersen AFB IFS |
|
PDF |
|
PACAF - Eielson AFB IFS |
|
PDF |
|
PACAF - JBER Elmendorf IFS |
|
PDF |
|
PACAF - JBER Richardson IFS |
|
PDF |
|
PACAF - JBPHH-Hickam IFS |
|
PDF |
|
PACAF - Kunsan AB IFS |
|
PDF |
|
PACAF - Yokota AB IFS |
|
PDF |
|
PACT (Patient Aligned Care Team) Space Module |
|
|
|
Paints and Coatings Knowledge Area |
|
|
|
Panelized Metal Wall Systems |
|
|
|
Parking Facilities |
|
|
|
Parking: Basement |
|
|
|
Parking: Outside / Structured |
|
|
|
Parking: Surface |
|
|
|
Passenger Terminal Facility Design Guide (AMC) |
|
PDF |
|
Passenger Terminal Facility Design Guide (AMC) (2008) |
|
PDF |
|
Passive Solar Heating |
|
|
|
PBS P-120 Public Buildings Service Cost and Schedule Management Policy Requirements (with PBS 1000.6B) |
|
PDF |
|
PBS P100 Facilities Standards for the Public Buildings Service, with 2022 Addendum |
|
PDF |
|
PBS-140 Child Care Center Design Guide |
|
PDF |
|
PCNRC Module 1: Overview Of Energy Savings Performance Contracts (ESPCs) |
|
|
|
PCNRC Module 2: Getting Started with an ESPC Project |
|
|
|
PCNRC Module 3: Developing Scope for Project and Request for Proposal |
|
|
|
PCNRC Module 4: Measurement & Verification for Energy Savings Performance Contracts |
|
|
|
PCNRC Module 5: Facilitating the Investment Grade Audit |
|
|
|
PCNRC Module 6: Reviewing the Investment Grade Audit and Project Proposal |
|
|
|
PCNRC Module 7: Construction, Performance Verification, and Project Acceptance |
|
|
|
PCNRC Module 8: Performance Period |
|
|
|
PCNRC Performance Contracting National Resource Center Training Certificate Series |
|
|
|
PEHS1 - Hearing/Screening Booth, 1 Person |
|
RVT , RVT , RVT |
|
PEHS4 - Physical Evaluation, Hearing Suite, 2 Room |
|
PDF PDF |
|
Performance Criteria Case Goods |
|
PDF |
|
Performance Criteria Desking Systems |
|
PDF |
|
Performance Criteria Ergo Seating |
|
PDF |
|
Performance Criteria Executive Wood |
|
PDF |
|
Performance Criteria Freestanding Desking Systems |
|
PDF |
|
Performance Criteria Metal DQ |
|
PDF |
|
Performance Criteria Systems Furniture |
|
PDF |
|
Performance Criteria Wood DQ |
|
PDF |
|
Performing Remote Audits using the Facility Energy Decision System: 1 - Overview |
|
|
|
Performing Remote Audits using the Facility Energy Decision System: 2 - FEDS Software Introduction |
|
|
|
Permanent Party Enlisted Dormitory |
|
|
|
Personnel Protection Calculator for Horizontal Piping |
|
|
|
Petroleum, Oil, and Lubricants (POL) Storage and Distribution Systems Knowledge Area |
|
|
|
PG 18-15 - A/E Submission Requirements Volume B - Major New Facilities, Major Additions, and Major Renovations |
|
|
|
PG 18-15 - A/E Submission Requirements Volume C - Minor and NRM Projects |
|
|
|
PG 18-15 - A/E Submission Requirements Volume D - Cemetery Projects |
|
|
|
PG 18-15 - A/E Submission Requirements Volume DB, Major Design-Build Projects |
|
|
|
PG 18-15 - A/E Submission Requirements Volume F - Seismic Upgrade Projects |
|
|
|
Pharmacy Service |
|
|
|
PHBS1 - Pharmacy, Bulk Storage, Low Volume |
|
PDF PDF |
|
PHBS2 - Pharmacy, Bulk Storage, Medium Volume |
|
PDF PDF |
|
PHBS3 - Pharmacy, Bulk Storage, High Volume |
|
PDF PDF |
|
PHDS1 - Pharmacy, Off-Site Satellite, Medium Volume |
|
PDF PDF |
|
PHIV1 - Pharmacy, IV Admixture, Low Volume |
|
PDF PDF |
|
PHIV2 - Pharmacy, IV Admixture, Medium Volume |
|
PDF PDF |
|
PHIV3 - Pharmacy, IV Admixture, High Volume |
|
PDF PDF |
|
PHMP1 - Pharmacy, Manufacturing & Prepack, Low Volume |
|
PDF PDF |
|
PHMP2 - Pharmacy, Manufacturing & Prepack, Medium Volume |
|
PDF PDF |
|
PHMP3 - Pharmacy, Manufacturing & Prepack, High Volume |
|
PDF PDF |
|
PHOD2 - Pharmacy, Storage/Dispensing, Medium Volume |
|
PDF PDF |
|
PHOD3 - Pharmacy, Storage/Dispensing, High Volume |
|
PDF PDF |
|
Photovoltaics |
|
|
|
Physical Fitness (Exercise Room) |
|
|
|
Physical Medicine and Rehabilitation Service Design Guide (with Site Visit Reports) |
|
|
|
Physical Security 2015 Design Manual Appendices |
|
|
|
Physical Security and Resiliency Design Manual (with Appendices) |
|
|
|
Physical Security: Design Of Building Envelopes For Blast Loads |
|
|
|
Physical Security: Designing Buildings to Resist Explosive Threats |
|
|
|
Phyto-Purification Systems |
|
|
|
Piers and Wharves Knowledge Area |
|
|
|
Place of Worship |
|
|
|
Planning |
|
|
|
Planning and Conducting Integrated Design (ID) Charrettes |
|
|
|
Planning for Dining Excellence (ACC) |
|
PDF |
|
Planning for Secure Buildings |
|
|
|
Planning, Procuring and Managing Solar PV Systems for Long-term Performance: Improving Performance and Reducing O&M Cost for Photovoltaic Systems |
|
|
|
Planning, Procuring and Managing Solar PV Systems for Long-term Performance: Planning a New Solar PV Acquisition - Key Steps & Considerations to Safety, Longevity, and Performance |
|
|
|
Planning, Procuring and Managing Solar PV Systems for Long-term Performance: Planning for the End of PV System Performance Period |
|
|
|
Planning, Procuring and Managing Solar PV Systems for Long-term Performance: Preventing and Recovering from Damage to Solar PV Systems |
|
|
|
PLAY1 - Playroom, Pediatrics |
|
PDF PDF |
|
Playground Design and Equipment |
|
|
|
Plaza |
|
|
|
Plaza Decks |
|
|
|
Plug-In Electric Vehicle Overview for Drivers |
|
|
|
Plumbing / Fire Protection / Sanitary |
|
|
|
Plumbing Design Manual |
|
|
|
Plumbing Engineering |
|
|
|
Policy and Mandates |
|
|
|
Policy on Use of Air Force Corporate Facility Standards and Standard Designs |
|
PDF |
|
Polytrauma Rehabilitation Center (PRC) |
|
|
|
Pope Air Force Base - Architectural Compatibility Plan (AMC) |
|
PDF |
|
Post Occupancy Evaluations |
|
|
|
Post Occupancy Evaluations Table References |
|
|
|
PP Package - Artwork Placement Plan |
|
PDF |
|
PP Package - Initial Outfitting Schedule |
|
PDF |
|
PP Package - Testing - Certification Schedule |
|
PDF |
|
PP Package - Training Schedule |
|
PDF |
|
Precast Concrete Wall Systems |
|
|
|
Predictive Testing & Inspection (PTSI) to Prevent Operational Interruptions |
|
|
|
Preliminary FF&E Cost Summary Multiple Vendors |
|
|
|
Preliminary FF&E Cost Summary Single Vendor |
|
|
|
Presidential Library |
|
|
|
Pressure and Temperature Resets |
|
|
|
Price Schedule |
|
PDF |
|
Pricing in Energy Savings Performance Contracts (ESPC) |
|
|
|
Principles and Goals of Accessible Design |
|
|
|
Private Sector Laboratory |
|
|
|
Private Toilet |
|
|
|
Procurement of Security Containers |
|
PDF |
|
Productive |
|
|
|
Program Management Plan For Air Force Milcon Execution |
|
PDF |
|
Project Delivery Teams |
|
|
|
Project Facilitator Fundamentals |
|
|
|
Project Information Form |
|
PDF |
|
Project Manager and Technical Lead Roles and Responsibilities Checklist |
|
PDF PDF |
|
Project Manager and Technical Lead Roles and Responsibilities Checklist Guidance |
|
PDF PDF |
|
Project Managers Guide for Design and Construction |
|
PDF |
|
PROJECT OVERSIGHT/ SIOH POLICY |
|
|
|
Project Planning Guide |
|
PDF |
|
Project Planning, Delivery, and Controls |
|
|
|
Project Room Contents - 12 Station |
|
|
|
Project Room Contents - 16 Station |
|
|
|
Project Room Contents - 20 Station |
|
|
|
Project Room Contents - 24 Station |
|
|
|
Project Room Contents - 28 Station |
|
|
|
Project Room Contents - 32 Station |
|
|
|
Project Room Contents - 36 Station |
|
|
|
Project Room Contents List – Updates |
|
PDF |
|
Promote Health and Well-Being |
|
|
|
Protect and Conserve Water |
|
|
|
Provide Accessibility for Historic Buildings |
|
|
|
Provide Comfortable Environments |
|
|
|
Provide Equal Access - Toilet Rooms |
|
|
|
Provide Equal Access - Toilet Rooms |
|
|
|
Provide Equal Access and Flexibility |
|
|
|
PS1-19 Structural Plywood |
|
PDF |
|
PS20-20, Revision 1 American Softwood Lumber Standard |
|
PDF |
|
Psychiatric Facility |
|
|
|
Psychosocial Value of Space |
|
|
|
PTEM1 - Electromyography (EMG) |
|
RVT , RVT , RVT |
|
PTTC1 - Treatment Cubicle, Physical Therapy |
|
RVT , RVT , RVT |
|
PTWT1 - Physical Therapy, Whirlpool Treatment Cubicle |
|
PDF PDF |
|
Public Library |
|
|
|
Pulmonary Medicine Service |
|
|
|
PV For The Long Haul: Designing and Operating PV Systems for 30-Plus Years |
|
|
|
Quality Standards and Design Principals Applicable to the Repair, Replacement and Modernization of Air Force Medical Facility Infrastructure Systems and Assets, Revision 10.0 |
|
PDF |
|
Quantifying the MILCON Cost Premium (MCP) |
|
PDF PDF |
|
Radiation Therapy Service |
|
|
|