Series
3 - DISCIPLINE-SPECIFIC CRITERIA
3-200: CIVIL / GEOTECHNICAL / LANDSCAPE ARCHITECTURE
CCR
FFC Agency & Library
Superseded Versions
UFC 3-240-01 Wastewater Collection, with Change 3 (03-01-2024)
UFC 3-240-01 Wastewater Collection, with Change 2 (01-01-2021)
UFC 3-240-01 Wastewater Collection, with Change 1 (08-01-2020)
UFC 3-240-01 Wastewater Collection (05-01-2020)
UFC 3-240-01 Wastewater Collection, with Change 2 (01-01-2019)
UFC 3-240-01 Wastewater Collection, with Change 1 (11-01-2014)
UFC 3-240-01 Wastewater Collection (11-01-2012)
UFC 3-240-04A Wastewater Collection (01-16-2004)
UFC 3-240-06A Wastewater Collection and Pumping (01-16-2004)
This Unified Facilities Criteria (UFC) provides requirements for domestic wastewater collection, domestic wastewater treatment, industrial wastewater collection and industrial wastewater treatment for the Department of Defense (DoD).